Distributed equipment power
Power delivered to 22 locations positioned throughout the facility.

Selected Central Ohio project experience
Real project experience across distribution facilities, equipment power, underground infrastructure, commercial lighting, and specialty systems.
Featured commercial project
Buckeye Electric installed a coordinated equipment-power system across a large operating facility. The scope required extensive overhead raceway routing, repeated equipment connections, and careful planning around existing structure and daily operations.
Power delivered to 22 locations positioned throughout the facility.
More than 800 feet of raceway coordinated through existing steel and facility systems.
Installation staged around access, equipment, workflow, and active production areas.
Identification, testing, field verification, and structured installation records.
Customer identities and exact locations are intentionally withheld.

Selected project experience
Project names stay private. The work, capabilities, and field experience speak for themselves.

Distribution + equipment power

Site + distribution

Facility upgrades

Equipment + systems
How commercial projects move
Confirm the scope, site conditions, operational constraints, drawings, and schedule before installation begins.
Coordinate routes, loads, equipment locations, access, materials, and shutdown needs with the project team.
Stage the work to protect people, equipment, and day-to-day facility activity while maintaining quality.
Complete identification, testing, corrections, field documentation, and a clear handoff for the finished scope.
Commercial service + contracting
Share the scope, drawings, project address, and target schedule for a commercial bid review.